[bsa_pro_ad_space id=1 链接=相同] [bsa_pro_ad_space id=2]

跳至内容

运营商新闻

US – Work grinds to a halt on Dream Las Vegas due to funding problems

By -21年2023月XNUMX日

Shopoff 房地产投资 和 轮廓, the developers behind Dream Las Vegas have confirmed that the build of the 531-room lifestyle hotel and casino the south end of the Las Vegas Strip has ground to a halt due to problems in the project’s funding.

Bill Shopoff, President and CEO of Shopoff Realty Investments, said: “Work has fully stopped at the site, other than anything required for safety. it will restart once the terms of the financing are finalised. We’re delayed on getting some financing,” he added to the Las Vegas Review.

The venue, which would house 12,000 square feet of meeting and event space and a 20,000-square-foot casino, had planned to open in late 2024.

It held a groundbreaking ceremony on July 8 and is now expected to cost $575m, up from the $555m previously envisaged.

通过分享
复制链接